Builder Assist Logo

Instant Download of Documents and Procedures for the Australian Building and Construction Industry to assist Developers, Builders, Tradespeople and Owner Builders.

Construction Management Plan (CMP) & Demolition Work Plan (DWP) Customised for Stuart Skinner

AUD $3,990.00

This Construction Management Plan (CMP) and Demolition Work Plan (DWP) provides a platform to assist in addressing councils (local government) conditions of consent. (Construction Management Plan is $ 2,495 including GST and Demolition Work Plan is $ 1,495 including GST).

Construction Management Plan and Demolition Work Plan Features:
• Instant Download
• Includes 1 round of amendments

See the “Product Description” below for document inclusions.

SKU: 6101-1 Category: Tags: ,

Description

Construction Management Plan (CMP)

The Construction Management Plan has been developed in accordance with the information provided by the purchaser.

The purchase price includes 1 round of amendments. Please review mark up any changes required and email back to Builder Assist for final amendment

The CMP includes all of the following:

  • Introduction
  • Purpose
  • Aim
  • Precedence
  • Document Control
  • Scope of this Plan
  • Commitment
  • Implementation
  • Managing and Training
  • Site Characteristics
  • Site Location
  • Proposed Works
  • Site Description
  • Construction Management
  • Approach
  • Approvals
  • Dilapidation Report
  • Existing Services Survey
  • Protection of Public Assets
  • Stormwater protection
  • Control of builders’ refuse
  • Sanitary facilities on site
  • Storing building material and equipment
  • Trees
  • Site Signage
  • Public Access and Pedestrian Management
  • Public/Worker Safety
  • Site Security
  • Hoardings
  • Construction Access
  • Deliveries
  • Construction Vehicle Parking
  • Construction Hours
  • Programming
  • Staging
  • Communication with the Community
  • Maintenance of Construction Site
  • Construction Methodology
  • Pre-start Meeting
  • Site Setup & Safety
  • Site Establishment
  • Erosion and Sediment
  • Site Amenities
  • Fencing
  • Craneage
  • Demolition
  • Shoring & Adequacy of Adjoining Property
  • Bulk Earthworks
  • Substructure & Inground Services
  • Structure
  • Concrete Placement
  • Services and Finishes
  • External Works
  • Environmental Control
  • General Requirements
  • Noise and Vibration
  • Airborne Dust Control
  • Stormwater Sediment Control
  • Onsite Building Waste Management
  • Building Waste on Public Land
  • Removal of Excavated Materials
  • Removal of Hazardous Waste Material
  • Asbestos Management
  • Site Discharge
  • Traffic Management
  • General
  • Footpath and Road Lane Closures
  • Road Occupancy Approval
  • Pedestrian Safety
  • Heavy Vehicle Movements
  • Standing of Vehicles During Construction
  • Crane & Concrete Pump Setup
  • Other Developments
  • Traffic Management and traffic Control plans
  • APPENDICES
  • Appendix 1 - Site Establishment Plan
  • Appendix 2 - Structural Engineering
  • Appendix 3 - Traffic Management Plan
  • Appendix 4 - Traffic Control Plans
  • Appendix 5 - Architectural Plan

Demolition Work Plan (DWP)

The Demolition Work Plan has been developed in accordance with the information provided by the purchaser.

The purchase price includes 1 round of amendments. Please review mark up any changes required and email back to Builder Assist for final amendment

The DWP includes all of the following:

  • Introduction
  • Introduction
  • Document Design
  • Supporting Documents
  • Safe Work Method Statements
  • Client Requirements
  • Licensing Requirements
  • Notification
  • Scope Of Works
  • Project Working Hours
  • Project Site Arial Photograph
  • Investigation
  • Investigation of Structures
  • Investigation of Site
  • Investigation of Services
  • Hazard Investigation / Identification
  • Demolition Exclusion Zone
  • Details Of Works
  • Work health Safety
  • Detailed Work Method
  • Protective Measures
  • Install Environmental Controls
  • Demolition Of Building
  • Truck Movements
  • Installation of Shoring System
  • Handover Site to Client Representative
  • Demobilise from Site
  • Permits
  • Personnel Qualifications
  • Notes
  • Site Waste Management
  • Site Waste Minimisation
  • Waste Management Plan
  • Remove Rubbish and Rubble from Site
  • Materials to Be Recovered
  • Materials to Landfill
  • Estimated Quantity of Material
  • Traffic Management Plan
  • Introduction
  • Pedestrian Management
  • Heavy Vehicle Movement
  • Surrounding Road Rules
  • Emergency Services Pick Up Point
  • On-Site Car Parking
  • Quality Management Strategies
  • Signature Of Employees
  • Appendix
  • Appendix 1 – Site Management plan
  • Appendix 2 – Hygienist Report
  • Appendix 3 – Structural Engineering Report (SER)
  • Appendix 4 – Architectural Drawings
  • Appendix 5 – Site Waste Minimisation & Management plan (SWMMP)
  • Appendix 6 – Traffic Management plan (TMP)
  • Appendix 7 – Traffic Control plan (TCP)

Project Plans

PDF Format

Provided in Word Format for added security

Instant Download

Instant Download

Your instant download is delivered via Email.