Glazing, Window and Door Installation Safe Work Method Statement (SWMS) inclusions:
Site Establishment
Pre Start Risk Assessment
Setting up the work area
Installing window and door frames
Subsills
Subheads
Angles
Brackets
Cover plates
Trims
Glazing
Caulking
Sealing
Using mobile cranes
Loading and unloading glass
PPE
Working at heights
Exposure to weather conditions
Tools, plant and equipment
Power supply
Manual handling
Deliveries and the like
House Keeping with Silica Dust, respirable crystalline silica (RCS)
High Risk Activities
PPE required
Plant and Equipment
Qualifications, Training & Competencies
Permits required
Legislation, Codes Of Practice and References
Safety Data Sheets (SDS)
Risk Matrix Table
Hierarchy of Control
Instructions provided
Job steps
Hazard identification
Control Measures
Breaks the work activity into logical job steps
Lists the typical hazards associated with each of these steps
Describes the control measures implemented to eliminate or control the risk for the workers safety
Describes how the control measures are to be implemented, monitored and reviewed
MS Word Format
Easy to update and customise using MS Word. Add your logo, colours and details to suit your unique business needs.
Instant Download
Your instant download is provided immediately upon purchase and is also delivered via Email.
Glazing, Window and Door Installation SWMS
The Glazing, Window and Door Installation Safe Work Method Statement breaks the tasks down into logical job steps, lists the typical hazards associated with each of these job steps, and describes the control measures implemented to eliminate or control the risk for the workers safety.
This Electrical Safety Checklist is used to keep a record of the initial check and follow-up periodic checks for the Site & Amenities addressing Australian Standards, Earth Leakage Devices, Switchboards, Outlets, Extension Leads, Power tools and the like.
FEATURES:
Instant Download
User friendly, easy to use template
MS Word formatted template for easy editing
Simply add your details
Scroll down ↓ to the “Product Description” below for document information.
This Electrical Test Record documents all electrical tools, plant and equipment, electrical switch boards, site amenities, site sheds and the like when tested and tagged by a licensed electrician or qualified person and labelled with the current date tag before being used on site.
FEATURES:
Instant Download
User friendly, easy to use template
MS Word formatted template for easy editing
Simply add your details
Scroll down ↓ to the “Product Description” below for document information.
Oxy Acetylene equipment requires a visual inspection prior to its use on site. Use this Oxy Acetylene Inspection Checklist when performing your visual inspection of the Oxy Acetylene equipment.
FEATURES:
• Instant Download
• User friendly, easy to use templates
• MS Word formatted templates for easy editing
• Simply add your details.