Instant Download of Documents and Procedures for the Australian Building and Construction Industry to assist Developers, Builders, Tradespeople and Owner Builders.
Painting SWMS – Safe Work Method Statement inclusions:
Site Establishment
Pre Start Risk Assessment
Setting up the work area
Surface preparation using a high pressure washer
Surface preparation sanding
Working with lead paint
Paint application
Airless spraying
Clean up
Public contact with painted surfaces
Paint spills
Spill kits
Skin eye and respiratory irritation
PPE
Hazardous substances
Falls
Using extension and step ladders
Using mobile scaffolding and access equipment
Harness & Fall Arrest System
Transporting hazardous substances
Working at heights
Exposure to weather conditions
Tools, plant and equipment
Power supply
Manual handling
Deliveries and the like
House Keeping with Silica Dust, respirable crystalline silica (RCS)
High Risk Activities
PPE required
Plant and Equipment
Qualifications, Training & Competencies
Permits required
Legislation, Codes Of Practice and References
Safety Data Sheets (SDS)
Risk Matrix Table
Hierarchy of Control
Instructions provided
Job steps
Hazard identification
Control Measures
Breaks the work activity into logical job steps
Lists the typical hazards associated with each of these steps
Describes the control measures implemented to eliminate or control the risk for the workers safety
Describes how the control measures are to be implemented, monitored and reviewed
MS Word Format
Easy to update and customise using MS Word. Add your logo, colours and details to suit your unique business needs.
Instant Download
Your instant download is provided immediately upon purchase and is also delivered via Email.
Painting Safe Work Method Statement
The Painters Safe Work Method Statement breaks the tasks down into logical job steps, lists the typical hazards associated with each of these job steps, and describes the control measures implemented to eliminate or control the risk for the workers safety.
This Electrical Test Record documents all electrical tools, plant and equipment, electrical switch boards, site amenities, site sheds and the like when tested and tagged by a licensed electrician or qualified person and labelled with the current date tag before being used on site.
FEATURES:
Instant Download
User friendly, easy to use template
MS Word formatted template for easy editing
Simply add your details
Scroll down ↓ to the “Product Description” below for document information.
All Man and Material Hoists must be inspected before use each day by the operator. Use this Hoist Inspection Checklist as a guide in performing your daily inspection and keep as a record on site as evidence of a risk management system being in place.
FEATURES:
• Instant Download
• User friendly, easy to use templates
• MS Word formatted templates for easy editing
• Simply add your details.