Pool Builder – Pack of 2 Safe Work Method Statements (SWMS)

Sale

Original price was: $538.00.Current price is: $484.00.

This  Pool Builders Pack is a set of 2 Safe Work Method Statements (SWMS) as identified in the Product Description below..

Pool Builders Safe Work Method Statement (SWMS) Pack Features:

  • Instant Download
  • User friendly, easy to use template
  • Instructions Provided
  • MS Word formatted template for easy editing
  • Simply add your business and site specific details

Scroll down to the “Product Description” below for document inclusions.

Pool Builder - Concrete Construction Safe Work Method Statement (SWMS)

The Concrete Pool Construction Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

Concrete Pool Construction Safe Work Method Statement SWMS Features:

  • Instant Download
  • User friendly, easy to use templates
  • Instructions Provided
  • MS Word formatted templates for easy editing
  • Simply add your business and site specific details.

Scroll down to the “Product Description” below for document inclusions.

Pool Builder - Fibreglass Installation Safe Work Method Statement (SWMS)

The Fibreglass Pool Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

Fibreglass Pool Installation Safe Work Method Statement SWMS Features:

  • Instant Download
  • User friendly, easy to use template
  • Instructions Provided
  • MS Word formatted template for easy editing
  • Simply add your business and site specific details

Scroll down to the “Product Description” below for document inclusions.

< Continue Shopping

Product Description

Pool Builders Safe Work Method Statements 2 Pack.

1) Concrete Pool Construction SWMS inclusions:

  • Site Establishment
  • Pre Start Risk Assessment
  • Setting up the work area
  • Excavation
  • Benching
  • Formwork
  • Plumbing
  • Electrical
  • Placing reinforcing
  • Concrete pumping
  • Placing concrete
  • Concrete deliveries
  • Tiling
  • Rendering
  • Exposure to weather conditions
  • Tools, plant and equipment
  • Power supply
  • Manual handling
  • Deliveries and the like
  • House Keeping with Silica Dust, respirable crystalline silica (RCS)
  • High Risk Activities
  • PPE required
  • Plant and Equipment
  • Qualifications, Training & Competencies
  • Permits required
  • Legislation, Codes Of Practice and References
  • Safety Data Sheets (SDS)
  • Risk Matrix Table
  • Hierarchy of Control
  • Instructions provided
  • Job steps
  • Hazard identification
  • Control Measures
  • Breaks the work activity into logical job steps
  • Lists the typical hazards associated with each of these steps
  • Describes the control measures implemented to eliminate or control the risk for the workers safety
  • Describes how the control measures are to be implemented, monitored and reviewed

2) Fibreglass Pool Installation SWMS inclusions:

  • Site Establishment
  • Pre Start Risk Assessment
  • COVID-19 Safety
  • Setting up the work area
  • Excavation
  • Benching
  • Pool Installation
  • Using Mobile Crane
  • Working with Fibreglass
  • Plumbing
  • Electrical
  • Backfill around pool
  • Formwork Locking Colar
  • Placing reinforcing
  • Concrete pumping
  • Placing concrete
  • Concrete deliveries
  • Tiling
  • Exposure to weather conditions
  • Tools, plant and equipment
  • Power supply
  • Manual handling
  • Deliveries and the like
  • High Risk Activities
  • PPE required
  • Plant and Equipment
  • Qualifications, Training & Competencies
  • Permits required
  • Legislation, Codes Of Practice and References
  • Safety Data Sheets (SDS)
  • Risk Matrix Table
  • Hierarchy of Control
  • Instructions provided
  • Job steps
  • Hazard identification
  • Control Measures
  • Breaks the work activity into logical job steps
  • Lists the typical hazards associated with each of these steps
  • Describes the control measures implemented to eliminate or control the risk for the workers safety
  • Describes how the control measures are to be implemented, monitored and reviewed

MS Word Format

Easy to update and customise using MS Word. Add your logo, colours and details to suit your unique business needs.

BA-Instant-Downloads-icon

Instant Download

Your instant download is provided immediately upon purchase and is also delivered via Email.

Pool Builders SWMS Pack

The Pool Builders Safe Work Method Statements breaks the tasks down into logical job steps, lists the typical hazards associated with each of these job steps, and describes the control measures implemented to eliminate or control the risk for the workers safety.

The Builder Assist Pool Builders SWMS is the most up to date building industry SWMS template and complies with the Work Health and Safety Regulations and Practices.

The Builder Assist Safe Work Method Statements are industry leading templates written and developed by building industry experts. All our construction SWMS are written to align with Safe Work Australia guidelines and construction industry standards.

LEGISLATION, CODES OF PRACTICE AND REFERENCES:
  • Work Health and Safety Act
  • Work Health and Safety Regulations
  • Applicable Codes of Practice

You can download each applicable Legislation, Codes of Practice and References by clicking on this link.

MS Word Format

Easy to update and customise using MS Word. Add your logo, colours and details to suit your unique business needs.

BA-Instant-Downloads-icon

Instant Download

Your instant download is provided immediately upon purchase and is also delivered via Email.

More Safe Work Method Statements