Builder Assist Logo

Instant Download of Documents and Procedures for the Australian Building and Construction Industry to assist Developers, Builders, Tradespeople and Owner Builders.

Roof Edge Rail WHS Management Plan

AUD $695.95

Specifically designed for each trade starting up a business, this Roof Edge Rail Installers Work Health Safety Management Plan provides the frame work to support the management of Work Health & Safety in workplace.

FEATURES:
• Instant Download
• User friendly, easy to use template
• MS Word formatted template for easy customisation
• Simply add your business and site specific details

See the “Product Description” below for further details.

SKU: 3340 Category:

Description

INCLUSIONS:
• Risk Assessment
• Roof Edge Rail Installation Safe Work Method Statement (SWMS)
• Document Control
• Project Details
• Work Health Safety and Environment Policy
• Site Safety Rules
• Objectives and Targets
• Personal Protective Equipment (PPE)
• Manual Handling Policy
• Manual Handling Procedure
• Manual Handling Techniques
• Roles and Responsibilities
• Training and Competency
• Consultation
• Toolbox and Pre-start Talks
• Workplace Inspection Checklist
• Plant and Equipment Policy
• Plant and Equipment Register
• Plant and Equipment Pre-start Checklist
• Plant and Equipment Regular Checklist
• Hazardous Substances, Dangerous Goods Register and MSDS Policy
• Hazardous Substances, Dangerous Goods and MSDS Register
• Electrical Equipment Policy
• Electrical Equipment Register
• Hazard Reporting Policy
• Hazard Report
• Injury and Incident Investigation
• Register of Injuries
• Incident Investigation Report
• WHS Management Plan Checklist
• Injury Management and Return-To-Work Procedures
• Employee Induction Checklist

LEGISLATION, CODES OF PRACTICE AND REFERENCES:
• Work Health and Safety Act
• Work Health and Safety Regulations
• Applicable Codes of Practice
• You can download each applicable Legislation, Codes of Practice and References by clicking on this link.