Description
Scaffold Erection SWMS
Each Scaffold Erection Safe Work Method Statement includes all of the following:
- Site establishment
- Setting up the work area
- Erecting and dismantling scaffold
- Ground conditions
- Leveling base frames
- Platforms
- Outriggers
- Stabilizers
- Bracing
- Ladders
- Guardrails
- Edge protection
- Additional lifts
- Sign-off & handover
- Use of Scaffold
- Electrical hazards
- Working at heights
- Exposure to weather conditions
- Tools, plant and equipment
- Power supply
- Manual handling
- Deliveries and the like
- High Risk Activities
- PPE required
- Plant and Equipment
- Qualifications, Training & Competencies
- Permits required
- Legislation, Codes Of Practice and References
- Safety Data Sheets (SDS)
- Risk Matrix Table
- Hierarchy of Control
- Instructions on how to complete this SWMS
- Job steps
- Hazard identification
- Control Measures
- Breaks the work activity into logical job steps
- Lists the typical hazards associated with each of these steps
- Describes the control measures implemented to eliminate or control the risk for the workers safety
- Describes how the control measures are to be implemented, monitored and reviewed
Each Scaffold Erection SWMS references the following:
- Work Health and Safety Act 2016
- Work Health and Safety Regulations 2019
- Australian Standards
- Safe Work Australia Codes of Practice
Scaffold Erection SWMS

MS Word Format
Easy to update and customise using MS Word.

Instant Download
Your instant download is delivered via Email.
The Scaffold Erection Safe Work Method Statement breaks the scaffolders work activity into logical job steps, lists the typical hazards associated with each of these steps, and describes the control measures implemented to eliminate or control the risk for the scaffolders safety.
The Builder Assist Scaffold Erection SWMS is the most up to date building industry SWMS template and complies with the Work Health and Safety Regulations and Practices.
The Builder Assist Safe Work Method Statements are industry leading templates written and developed by building industry experts.