Description
INCLUSIONS:
• Site establishment
• Setting up the work area
• Water proofing
• Internal wet areas
• External decks
• Retaining walls
• Expansion joints
• Water tanking
• Preparing the substrate
• Cutting down floor wastes
• Installing aluminium angles
• Using primers sealants glues solvents membranes and chemicals
• MSDS
• Priming the substrate
• Applying membrane
• Confined space work
• PPE
• Working at heights
• Exposure to weather conditions
• Tools, plant and equipment
• Power supply
• Manual handling
• Deliveries and the like
• Risk matrix
• Breaks the work activity into logical job steps
• Lists the typical hazards associated with each of these steps
• Describes the control measures implemented to eliminate or control the risk for the workers safety
• Describes how the control measures are to be implemented, monitored and reviewed
REFERENCES:
• Work Health and Safety Act 2011
• Work Health and Safety Regulations 2014
• Australian Standards
• Safe Work Australia Codes of Practice