Swimming Pool Safe Work Method Statements

These Swimming Pool Safe Work Method Statements (SWMS) provide support with the management of Work Health & Safety, Human Resources and Pool Building Systems in the workplace.

Filters
    Filter Trade Docs by
    Filters Docs By
    Docs & Procedure Types
    Safe Work Method Statements (Construction SWMS)
    Trade Specific
    Air Conditioning
    Boilermaker
    Bore Drilling
    Brick Cleaner
    Bricklayer
    Builder
    Carpenter
    Carpenter Joiner
    Carpet Layer
    Concrete Cutter / Core Driller
    Concrete Pumping
    Concreter
    Cool Room Builder
    Demolition
    Dogman
    Driving
    Electrician
    Excavation
    Fire Protection
    Fire Stopping
    Forklift
    Formworker
    Glazier
    Hot Works
    Insulation
    Irrigation
    Landscaper
    Mechanical Ventilation
    Metal Worker
    Painter
    Pest Control
    Piling
    Plasterer - Gypy
    Plumber & Drainage
    Pool Builder
    Precast Concrete Panels
    Renderer
    Rigger
    Roof Edge Rail Installer
    Roof Plumber
    Roof Tiler
    Scaffolder
    Sprinkler Fitter
    Steel Fixing
    Structural Steel
    Tiler – Wall & Floor
    Traffic Controller
    Waterproofing
    Welding
    Windows Doors & Shopfronts
    Show moreShow less
    Docs
    Packs(1)
    Popular Documents(2)
    Safe Work Method Statements (Construction SWMS)(3)

    Document Features:

    eWAY Payment Gateway

3 Products

  • Concrete Pool Construction SWMS
    $269.00

    The Concrete Pool Construction Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Concrete Pool Construction Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Fibreglass Pool Installation SWMS
    $269.00

    The Fibreglass Pool Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Fibreglass Pool Installation Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Pool Builders SWMS Sale
    Original price was: $538.00.Current price is: $484.00.

    This  Pool Builders Pack is a set of 2 Safe Work Method Statements (SWMS) as identified in the Product Description below..

    Pool Builders Safe Work Method Statement (SWMS) Pack Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

INDUSTRY LEADING SWMS TEMPLATES

Swimming Pool Construction Safe Work Method Statements include site establishment, setting up the work area, PPE, Working at heights, exposure to weather conditions, tools, plant and equipment handling, power supply, risk matrix, typical hazards associated with swimming pool construction on-site activities, as well as control measure to eliminate or control the risk for the workers safety.

LEGISLATION, CODES OF PRACTICE AND REFERENCES

• Work Health and Safety Act
• Work Health and Safety Regulations
• Applicable Codes of Practice
• You can download each applicable Legislation, Codes of Practice and References by clicking on this link.

View our full range of our Safe Work Method Statements