Builder Assist Logo

Instant Download of Documents and Procedures for the Australian Building and Construction Industry to assist Developers, Builders, Tradespeople and Owner Builders.

Swimming Pool Safe Work Method Statements

These Swimming Pool Safe Work Method Statements (SWMS) provide support with the management of Work Health & Safety, Human Resources and Pool Building Systems in the workplace.

  • Instant Download
  • User Friendly, very easy to use templates
  • Full instructions provided
  • MS Word formatted template for easy editing
  • Simply add your business and site specific details

INDUSTRY LEADING SWMS TEMPLATES

Swimming Pool Construction Safe Work Method Statements include site establishment, setting up the work area, PPE, Working at heights, exposure to weather conditions, tools, plant and equipment handling, power supply, risk matrix, typical hazards associated with swimming pool construction on-site activities, as well as control measure to eliminate or control the risk for the workers safety.


LEGISLATION, CODES OF PRACTICE AND REFERENCES

• Work Health and Safety Act
• Work Health and Safety Regulations
• Applicable Codes of Practice
• You can download each applicable Legislation, Codes of Practice and References by clicking on this link.

Work-Safe-Method-Statement-Book

The Concrete Swimming Pool construction Safe Work Method Statement (SWMS) is a complete and comprehensive document that outlines all the on-site procedures.

Here are just a few of the key inclusions, Site Establishment, Pre Start Risk Assessment, COVID-19 Safety, Setting up the work area, Excavation, Benching, Formwork, Plumbing, Electrical, Placing reinforcing, Concrete pumping, Placing concrete, Concrete deliveries, Tiling, Rendering, Exposure to weather conditions, Tools, plant and equipment, Power supply, Manual handling, Deliveries and the like, High Risk Activities, PPE required, Plant and Equipment, Qualifications, Training & Competencies, Permits required, Legislation, Codes Of Practice and References, Safety Data Sheets (SDS), Risk Matrix Table, Hierarchy of Control, Instructions on how to complete this SWMS, Job steps, Hazard identification, Control Measures, Breaks the work activity into logical job steps, Lists the typical hazards associated with each of these steps, Describes the control measures implemented to eliminate or control the risk for the workers safety, Describes how the control measures are to be implemented, monitored and reviewed and many other safety  controls associated with Concrete Pool Construction work place practices.

Click Here to View Full Product Details

Work-Safe-Method-Statement-Book

The Fibreglass Pool Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document that outlines all the on-site procedures.

Here are just a few of the key inclusions, Site Establishment, Pre Start Risk Assessment, COVID-19 Safety, Setting up the work area, Excavation, Benching, Pool Installation, Using Mobile Crane, Working with Fibreglass, Plumbing, Electrical, Backfill around pool, Formwork Locking Colar, Placing reinforcing, Concrete pumping, Placing concrete, Concrete deliveries, Tiling, Exposure to weather conditions, Tools, plant and equipment, Power supply, Manual handling, Deliveries and the like, High Risk Activities, PPE required, Plant and Equipment, Qualifications, Training & Competencies, Permits required, Legislation, Codes Of Practice and References, Safety Data Sheets (SDS), Risk Matrix Table, Hierarchy of Control, Instructions on how to complete this SWMS, Job steps, Hazard identification, Control Measures, Breaks the work activity into logical job steps, Lists the typical hazards associated with each of these steps, Describes the control measures implemented to eliminate or control the risk for the workers safety, Describes how the control measures are to be implemented, monitored and reviewed and many other safety  controls associated with Fibreglass Pool Installation work place practices.

Click Here to View Full Product Details