Safe Work Method Statements (Construction SWMS)

Our construction swms templates are specifically designed for each building trade.  These Safe Work Method Statement (SWMS) documents provide support for the management of Work Health & Safety (WHS) in the workplace.

Filters
    Filter Trade Docs by
    Filters Docs By
    Docs & Procedure Types
    Trade Specific
    Air Conditioning
    Boilermaker
    Bore Drilling
    Brick Cleaner
    Bricklayer
    Builder
    Carpenter
    Carpenter Joiner
    Carpet Layer
    Concrete Cutter / Core Driller
    Concrete Pumping
    Concreter
    Cool Room Builder
    Demolition
    Dogman
    Driving
    Electrician
    Excavation
    Fire Protection
    Fire Stopping
    Forklift
    Formworker
    Glazier
    Hot Works
    Insulation
    Irrigation
    Landscaper
    Mechanical Ventilation
    Metal Worker
    Painter
    Pest Control
    Piling
    Plasterer - Gypy
    Plumber & Drainage
    Pool Builder
    Precast Concrete Panels
    Renderer
    Rigger
    Roof Edge Rail Installer
    Roof Plumber
    Roof Tiler
    Scaffolder
    Sprinkler Fitter
    Steel Fixing
    Structural Steel
    Tiler – Wall & Floor
    Traffic Controller
    Waterproofing
    Welding
    Windows Doors & Shopfronts
    Show moreShow less
    Docs

    Document Features:

    eWAY Payment Gateway

5 Products

  • concrete cutting swms
    $89.95

    The Concrete Cutting / Core Drilling Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Concrete Cutting / Core Drilling (SWMS) Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Concrete Pumping SWMS
    $89.95

    The Concrete Pumping Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Concrete Pumping Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • concreting swms
    $89.95

    The Concreting Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Concreting Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Formwork SWMS
    $89.95

    The Formwork Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Formwork Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • silica dust swms
    $89.95

    The Working with Silica Dust Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Working with Silica Dust SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

INDUSTRY LEADING SWMS TEMPLATES

Our construction swms templates for all trades break a work activity into logical job steps, list the typical hazards associated with each of these steps, and describe the control measures implemented to eliminate or control the risk for the workers’ safety.

The Builder Assist Safe Work Method Statements are industry leading templates written and developed by building industry experts. Each Builder Assist SWMS template includes all of the following:

  • Trade Specific Safe Work Method Statement Templates
  • Site establishment
  • Setting up the work area
  • Personal Protective Equipment
  • Working at heights
  • Exposure to weather conditions
  • Tools, plant and equipment
  • Power supply
  • Manual handling
  • Deliveries and the like
  • Plant and Equipment
  • Qualifications, Training & Competencies
  • Permits required
  • Legislation, Codes Of Practice and References
  • Safety Data Sheets (SDS)
  • Risk Matrix Table
  • Hierarchy of Control
  • Instructions on how to complete the SWMS
  • Job steps
  • Hazard identification
  • Control Measures
  • Breaks the work activity into logical job steps
  • Lists the typical hazards associated with each of these steps
  • Describes the control measures implemented to eliminate or control the risk for the workers safety
  • Describes how the control measures are to be implemented, monitored and reviewed

 

INDUSTRY-COMPLIANT SWMS TEMPLATES

Our construction swms templates are the most up to date building industry SWMS templates and comply with the following Work Health and Safety Regulations and Practices:

 

LEGISLATIVE REQUIREMENT

A person conducting a business or undertaking carrying out of “high risk construction work” must, before high risk construction work commences, ensure that a safe work method statement (SWMS) for the proposed work has been prepared.

A Safe Work Method Statement must:
(a) Identify the work that is high risk construction work; and

(b) Specify hazards relating to the high risk construction work and risks to health and safety associated with those hazards; and

(c) Describe the measures to be implemented to control the risks; and

(d) Describe how the control measures are to be implemented, monitored and reviewed

A Safe Work Method Statement breaks a work activity into logical job steps, lists the typical hazards associated with each of these steps, and describes the control measures implemented to eliminate or control the risk for the workers safety.