Filter Trade Docs by
    Filters Docs By
    Docs & Procedure Types
    Trade Specific
    Air Conditioning
    Boilermaker
    Bore Drilling
    Brick Cleaner
    Bricklayer
    Builder
    Carpenter
    Carpenter Joiner
    Carpet Layer
    Concrete Cutter / Core Driller
    Concrete Pumping
    Concreter
    Cool Room Builder
    Demolition
    Dogman
    Driving
    Electrician
    Excavation
    Fire Protection
    Fire Stopping
    Forklift
    Formworker
    Glazier
    Hot Works
    Insulation
    Irrigation
    Landscaper
    Mechanical Ventilation
    Metal Worker
    Painter
    Pest Control
    Piling
    Plasterer - Gypy
    Plumber & Drainage
    Pool Builder
    Precast Concrete Panels
    Renderer
    Rigger
    Roof Edge Rail Installer
    Roof Plumber
    Roof Tiler
    Scaffolder
    Sprinkler Fitter
    Steel Fixing
    Structural Steel
    Tiler – Wall & Floor
    Traffic Controller
    Waterproofing
    Welding
    Windows Doors & Shopfronts
    Show moreShow less
    Docs

    Document Features:

    eWAY Payment Gateway

63 Products

  • Air Conditioning Safe Work Method Statement
    $89.95

    The Air Conditioning Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Air Conditioning Safe Work Method Statement (SWMS) Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Boilermaker Welding JSA
    $89.95

    The Boilermaker Welding Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Boilermaker Welding SWMS Features:

    • Instant Download
    • Instructions Provided
    • User friendly, easy to use templates
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Brick Cleaning Safe Work Method Statement
    $89.95

    The Brick Cleaning Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Brick Cleaning Safe Work Method Statement (SWMS) Features:

    • Package designed for starting a new business
    • Instant Download
    • User friendly, easy to use templates
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Bricklaying Safe Work Method Statement
    $89.95

    The Bricklaying Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Bricklayer Safe Work Method Statement (SWMS) Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Build your own SWMS Pack - Discount Bundle
    From: $89.95

    Build your own package and save!

    5+ Pack = 10% Savings
    10+ Pack = 15% Savings
    15+ Pack = 20% Savings

  • Builders Pack of ITPs Sale
    Original price was: $809.55.Current price is: $688.12.

    This Builders 9 Pack is a set of 9 Safe Work Method Statements (SWMS) as identified in the Product Description below.

    Builders Pack Safe Work Method Statement (SWMS) Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Builders Pack of ITPs Sale
    Original price was: $4,601.00.Current price is: $1,995.00.

    This Builders Pack is a set of 46 Safe Work Method Statements (SWMS) as identified in the Product Description below.

    Builders Pack Safe Work Method Statement (SWMS) Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • External Cladding ITP
    $89.95

    The External Cladding Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    External Cladding Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Carpentry Fix Out SWMS
    $89.95

    The Carpentry Fix Out Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Carpentry Fix Out Safe Work Method Statements (SWMS) Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • carpentry framing swms
    $89.95

    This Carpentry Framing Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Carpentry Framing Safe Work Method (SWMS) Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • carpentry hardwood swms
    $89.95

    The Working with Hardwood Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Working with Hardwood SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • carpentry joinery swms
    $89.95

    The Carpentry Joinery Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Carpentry Joinery Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • MDF SWMS
    $89.95

    The Working with MDF Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Working with MDF SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Particleboard SWMS
    $89.95

    The Working with Particleboard Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Working with Particleboard SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Carpenter Steel Frame ITP
    $89.95

    This Carpentry Steel Frame and Truss Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Carpentry Steel Frame and Truss Installation Safe Work Method (SWMS) Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Carpentry SWMS Sale
    Original price was: $1,079.40.Current price is: $863.50.

    This Carpenters Pack is a set of 12 Safe Work Method Statements (SWMS) as identified in the Product Description below.

    Safe Work Method Statement (SWMS) Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Carpet Layer SWMS
    $89.95

    The Carpet Layer Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Carpet Layer SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • concrete cutting swms
    $89.95

    The Concrete Cutting / Core Drilling Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Concrete Cutting / Core Drilling (SWMS) Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Concrete Pumping SWMS
    $89.95

    The Concrete Pumping Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Concrete Pumping Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • concreting swms
    $89.95

    The Concreting Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Concreting Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • confined space swms
    $89.95

    The Confined Space Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Confined Space SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • cool room construction
    $89.95

    The Cool Room Construction Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Cool Room Construction SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Demolition ITP
    $89.95

    The Demolition Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Demolition SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Safe Driving
    $89.95

    The Safe Driving Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining driving procedures.

    Safe Driving SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Electrical SWMS | Builder Assist
    $89.95

    The Electrical Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Electrical Safe Work Method Statement (SWMS) Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • electrical swms
    $89.95

    The Electrical Working on or Near Electrical Installations Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Electrical Working on or Near Electrical Installations Safe Work Method Statement (SWMS) Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • EWP Boom Lift
    $89.95

    The Safe Use of Boom Lift Elevating Work Platform (EWP) Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Safe Use of Boom Lift Elevating Work Platform (EWP) SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Scissor Lift Safe Work Method Statement
    $89.95

    The Safe Use of Scissor Lift Elevating Work Platform (EWP) Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Safe Use of Scissor Lift Elevating Work Platform (EWP) SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Excavation SWMS
    $89.95

    The Excavation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Excavation Safe Work Method Statement (SWMS) Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Forklift SWMS
    $89.95

    The Forklift Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Forklift SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Formwork SWMS
    $89.95

    The Formwork Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Formwork Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Glazing Window and Door Installation SWMS
    $89.95

    This Glazing, Window and Door Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Glazing, Window & Door SWMS FEATURES:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Hot works SWMS
    $89.95

    The Hot Works Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Hot Works SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Insulation Safe Work Method Statement
    $89.95

    The Insulation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Insulation Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Irrigation SWMS
    $89.95

    The Irrigation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Irrigation Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Lagging, Thermal & Acoustic Insulation Lagging Safe Work Method Statement (SWMS)
    $89.95

    The Thermal & Acoustic Insulation Lagging Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Thermal & Acoustic Insulation Lagging Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Painting SWMS
    $89.95

    The Painting Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Painters Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Pest Control SWMS
    $89.95

    The Pest Control Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Pest Control SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Plastering SWMS
    $89.95

    The Plastering Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Plastering SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • plumbing swms
    $89.95

    The Plumbing Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Plumbing SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Concrete Pool Construction SWMS
    $269.00

    The Concrete Pool Construction Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Concrete Pool Construction Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Fibreglass Pool Installation SWMS
    $269.00

    The Fibreglass Pool Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Fibreglass Pool Installation Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Pool Builders SWMS Sale
    Original price was: $538.00.Current price is: $484.00.

    This  Pool Builders Pack is a set of 2 Safe Work Method Statements (SWMS) as identified in the Product Description below..

    Pool Builders Safe Work Method Statement (SWMS) Pack Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Precast Concrete Panel Installation SWMS
    $89.95

    The Precast Concrete Panel Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Precast Concrete Panel Installation SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Renderer SWMS
    $89.95

    The Renderer Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Rendering (& White Set) SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Roof Edge Rail Installation SWMS
    $89.95

    The Roof Edge Rail Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Roof Edge Rail Installation SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Roof Plumbers WHS Management Plan
    $89.95

    The Roofing Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Roof Plumber SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Roof Tiling SWMS
    $89.95

    The Roof Tiling Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Roof Tiling SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Scaffold Erection SWMS
    $89.95

    The Scaffold Erection Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Scaffold Erection SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Mobile Scaffold SWMS
    $89.95

    The Mobile Scaffold Erection Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Mobile Scaffold SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • silica dust swms
    $89.95

    The Working with Silica Dust Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Working with Silica Dust SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Sprinkler Pipe Safe Work Method Statement
    $89.95

    The Sprinkler Fitter Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Sprinkler Fitter SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Steel Fixing SWMS
    $89.95

    The Steel Fixing Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Steel Fixing SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Riggers WHS Management Plan
    $89.95

    The Structural Steel Installation Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Structural Steel Installation SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • tiling swms
    $89.95

    The Wall & Floor Tiling Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Tiling SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Working on or near a roadway
    $89.95

    The Working On or Near a Roadway Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining driving procedures.

    Working On or Near a Roadway SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Tree Works SWMS
    $89.95

    The Tree Works Safe Work Method Statement has been amended as requested.

    Tree Works Safe Work Method Statement SWMS Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • waterproofing swms
    $89.95

    The Waterproofing Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Waterproofing SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Welding Safe Work Method Statement (SWMS)
    $89.95

    The Welding Safe Work Method Statement (SWMS) is a complete and comprehensive document outlining on-site procedures.

    Welder SWMS Features:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Compliance Review - Safe Work Method Statement Compliance Review
    $9.95

    This “Safe Work Method Statement Compliance Review” is used to record the regular reviews of the SWMS during the execution of the work, to which the SWMS relates to, whilst the work takes place on site, to ensure employees and subcontractors are adhering to the risk controls identified in their SWMS.

    Compliance Review Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • Register - Safe Work Method Statements Register
    $9.95

    This Safe Work Method Statement Register is used to record and keep track of all the safe work method statements developed for each site.

    Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

  • SWMS Template
    $69.95

    The Safe Work Method Statement Template (SWMS) is a complete and comprehensive document outlining on-site procedures.

    SWMS Template FEATURES:

    • Instant Download
    • User friendly, easy to use templates
    • Instructions Provided
    • MS Word formatted templates for easy editing
    • Simply add your business and site specific details.

    Scroll down to the “Product Description” below for document inclusions.

  • Verification Review - Safe Work Method Statement Verification Review
    $19.95

    A Safe Work Method Statement provided by a subcontractor needs to be checked, reviewed, verified and approved prior to the subcontractor starting works on site.

    This “Safe Work Method Statement Verification Review” provides a format with a series of checklist items to assist with this review process.

    Features:

    • Instant Download
    • User friendly, easy to use template
    • Instructions Provided
    • MS Word formatted template for easy editing
    • Simply add your business and site specific details

    Scroll down to the “Product Description” below for document inclusions.

     

INDUSTRY LEADING SWMS TEMPLATES

Our construction swms templates for all trades break a work activity into logical job steps, list the typical hazards associated with each of these steps, and describe the control measures implemented to eliminate or control the risk for the workers’ safety.

The Builder Assist Safe Work Method Statements are industry leading templates written and developed by building industry experts. Each Builder Assist SWMS template includes all of the following:

  • Trade Specific Safe Work Method Statement Templates
  • Site establishment
  • Setting up the work area
  • Personal Protective Equipment
  • Working at heights
  • Exposure to weather conditions
  • Tools, plant and equipment
  • Power supply
  • Manual handling
  • Deliveries and the like
  • Plant and Equipment
  • Qualifications, Training & Competencies
  • Permits required
  • Legislation, Codes Of Practice and References
  • Safety Data Sheets (SDS)
  • Risk Matrix Table
  • Hierarchy of Control
  • Instructions on how to complete the SWMS
  • Job steps
  • Hazard identification
  • Control Measures
  • Breaks the work activity into logical job steps
  • Lists the typical hazards associated with each of these steps
  • Describes the control measures implemented to eliminate or control the risk for the workers safety
  • Describes how the control measures are to be implemented, monitored and reviewed

 

INDUSTRY-COMPLIANT SWMS TEMPLATES

Our construction swms templates are the most up to date building industry SWMS templates and comply with the following Work Health and Safety Regulations and Practices:

 

LEGISLATIVE REQUIREMENT

A person conducting a business or undertaking carrying out of “high risk construction work” must, before high risk construction work commences, ensure that a safe work method statement (SWMS) for the proposed work has been prepared.

A Safe Work Method Statement must:
(a) Identify the work that is high risk construction work; and

(b) Specify hazards relating to the high risk construction work and risks to health and safety associated with those hazards; and

(c) Describe the measures to be implemented to control the risks; and

(d) Describe how the control measures are to be implemented, monitored and reviewed

A Safe Work Method Statement breaks a work activity into logical job steps, lists the typical hazards associated with each of these steps, and describes the control measures implemented to eliminate or control the risk for the workers safety.